Completed Project – Oncology Level D & E

Oncology Vertical Extension Building at Southampton General Hospital

Oncology Level D & E Vertical extension provides 24 beds per floor totalling additional capacity of 48 beds overall (consists of 16 sides rooms with ensuites and 32 standard bed bays). Level D will be an Oncology Ward to assist with Backlog of Cancer Patients and Level E to be a Medicine Ward. 

The project had commenced June 2022 and was handed over by the Main Contractor on the 14th July 2023. Level D will accepts its first patients by 6th August 2023.

  • Project Value: £15m
  • Programme: 13 months (including design and build)
  • Contract: JCT Standard Form with Contractors Design Portion
  • Project Manager: Ibrahim Sen
  • Main Contract: LST Projects
  • Architect: Kendall Kingscott
  • M&E: Arup
  • Structural Engineer: Whites Structures