Oncology Level D & E Vertical extension provides 24 beds per floor totalling additional capacity of 48 beds overall (consists of 16 sides rooms with ensuites and 32 standard bed bays). Level D will be an Oncology Ward to assist with Backlog of Cancer Patients and Level E to be a Medicine Ward.
The project had commenced June 2022 and was handed over by the Main Contractor on the 14th July 2023. Level D will accepts its first patients by 6th August 2023.
- Project Value: £15m
- Programme: 13 months (including design and build)
- Contract: JCT Standard Form with Contractors Design Portion
- Project Manager: Ibrahim Sen
- Main Contract: LST Projects
- Architect: Kendall Kingscott
- M&E: Arup
- Structural Engineer: Whites Structures